We start with a detailed design project: from a dimensional plan to 3D visualization.

We also prepare a full set of working drawings for the construction team, which is the key to the successful implementation of the project.

DESIGN PROJECT

Design project
from 2 months

The development and implementation of a design project is a multi-stage and time-consuming process.
The total cost largely depends on the area of the premises and the complexity of the facility.

1.

We always start with taking measurements and photos of the object. We also arrange a meeting to discuss and draw up a detailed brief (technical assignment) with the client. Based on our selection of references by style, furniture and equipment, we discuss the filling of each area of the future home/office/restaurant separately.
This allows us to work with the most complete and up-to-date information from the very beginning. The brief will help us get to know you better and understand your needs.

2.

Next step is preparing of several options for layouts and mood & concept boards according to the stylistic, color scheme and ideas for the future interior.

3.

After the approval of the layout and the concept of the project, we perform photorealistic 3D visualization with carefully selected finishing materials, furniture and lighting (by request).
You will be able to fully imagine your future interior and see each area from several angles.

4.

Design project is carried out in parallel with 3D visualization and is finalized after its approval. It includes a complete package of technical documentation (drawings with specifications) required to bring the design project to life.

DESIGNER SUPERVISION

Designer supervision

Includes a range of services required for the implementation of an agreed design project, including conrol after the quality repair works, coordination of all the suppliers and contractors at the facility.

List of Works on Designer supervision:

  • regular site visits

  • timely reports on works at the facility

  • verification of the compliance of the construction work performed according to the project drawings

  • making adjustments and clarifications to the drawings, if necessary

  • introduction of clarifications on the design project to the foreman of the construction team

  • control over the use of the purchased finishing materials, equipment, furniture and decor items listed in the design project